Kings Bluff Parallel Raw Water Main Pipeline
Water Transmission
One of the longest water transmission mains in the region, this project utilizes 14 miles of 54-inch diameter engineered steel pipe for a new raw water main traversing three counties served by the Kings Bluff Raw Water Facilities in Southeastern North Carolina. The new line parallels an existing 48” PCCP line constructed in the 1980s and is being built to meet the growing coastal region’s demand for raw water.
Engineered Steel Water Pipe